<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>mine-earth</title>
    <link>https://www.mineearth.com.au</link>
    <description />
    <atom:link href="https://www.mineearth.com.au/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>Article 2 of 3 | Landform Rehabilitation: How Quality Survey Data Turns Design Into Reality</title>
      <link>https://www.mineearth.com.au/landform-rehabilitation-how-quality-survey-data-turns-design-into-reality</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            Reliable survey data is essential to rehabilitation planning and design, as covered in our first article
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/articles"&gt;
           Better Mine Rehabilitation Starts With Better Survey Data
          &lt;/a&gt;&#xD;
    &lt;span&gt;
           . During construction however, the focus shifts to building the landform accurately, efficiently and in line with the approved design.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial+Article+2+-+Construction+support+-+cut.png" alt="Construction survey support connects design intent with the machines and people delivering the works"/&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Construction survey support connects design intent with the machines and people delivering the works. It provides practical controls in the field, keeps machine guidance current and checks the developing surface while corrections can still be made efficiently.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           For rehabilitation projects, our survey support links approved design surfaces with field delivery, progressive verification and final as-constructed evidence:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Set out
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             construction limits, design features and project-specific controls
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Machine control setup,
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             establishing site control, a reliable GNSS base station and machine control
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Conformance assessments
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             to verify constructed surfaces against design surfaces and responding to variances
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Construction support
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             providing responsive survey input as earthworks progress
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Completion support
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             to develop the as-constructed evidence needed for acceptance and handover
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           This integrated approach helps keep construction aligned with the design while providing a clear, defensible record of how the landform was built.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Set out and Machine Control
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Construction starts by establishing reliable site control and a GNSS base station for machine guidance and to establish common positional reference across the work area.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Machine control calibration is equally important to allow operators to validate bucket and blade accuracy against known points, reducing the risk of compounding errors across the project.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            ﻿
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Often during works, design iterations are required and survey support is needed to manage the machine control files, so that the design being used is the latest one.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Effective setup typically includes:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            ﻿
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Site control and GNSS
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             - Establishing an accurate reference control points for GNSS base station setup and survey checks
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Machine control setup
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             - Loading and updating current design files
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Construction mark-out
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             - Pegging critical boundaries and protected areas before work proceeds
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
            Calibration and checks
           &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
             - Completing initial calibration, bench checks and ongoing verification
            &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial+Article+2+-+Design+v+final+-+cut.png" alt="A geospatial design surface to develop a practical and constructible rehabilitation design."/&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Construction Surveys
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Survey involvement continues throughout construction. Regular field checks provide timely information on progress, levels, slope angles and surfaces, enabling the project team to respond before small deviations become costly rework.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Conformance assessments
          &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Conformance assessments compare the constructed surface with the design. They provide clear evidence of where specifications and tolerances have been met and identify areas that may require rework.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Progress capture and reporting
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Regular survey captures key construction stages and quantifies progress against the design. The resulting surfaces support quality assurance, volumetric checks and focused reporting to the project team.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Final conformance
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           At completion, the final conformance assessment brings the construction record together. As-constructed surfaces and clear variance reporting allow the project team to demonstrate whether the design intent has been achieved.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Establishing a monitoring baseline
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The final survey establishes a baseline for future monitoring to compare erosion, drainage and vegetation performance against the as-constructed surface. Performance monitoring methods and deliverables are explored in the next article in this series - release due next week.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial+Article+2+-+Construction+support+cycle+-+cut.png" alt="Image of a final surface demonstrating compliance with closure commitments."/&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Closing Thoughts
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Construction survey support is the link between a rehabilitation design and a defensible as-constructed landform. Its value is practical: accurate machine guidance, clear set out, timely checks and evidence for completion.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            ﻿
           &lt;/span&gt;
           By integrating these controls throughout earthworks, Mine Earth helps clients move confidently from design intent to construction completion and sign-off.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;
           Need support turning rehabilitation designs into constructed outcomes?
          &lt;/strong&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Mine Earth provides practical survey support throughout construction, from site control and machine guidance through to conformance assessment and final as-constructed evidence.
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial-Article-2---Construction-support---cut-932475db.png" length="1546199" type="image/png" />
      <pubDate>Tue, 10 Nov 2026 05:53:55 GMT</pubDate>
      <guid>https://www.mineearth.com.au/landform-rehabilitation-how-quality-survey-data-turns-design-into-reality</guid>
      <g-custom:tags type="string">Technical Articles</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial+Article+2+-+Design+v+final+thumbnail.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial-Article-2---Construction-support---cut-932475db.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Article 1 of 3 | Better Mine Rehabilitation Starts With Better Survey Data</title>
      <link>https://www.mineearth.com.au/better-mine-rehabilitation-starts-with-better-survey-data</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           High-quality survey (geospatial) data is fundamental to successful mine rehabilitation. It underpins every stage of a project - from planning and design through to construction delivery and long-term performance monitoring.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           One of the most common gaps encountered across rehabilitation projects is the absence of reliable survey data and/or sufficient on-site survey capability. When these gaps exist, risks can emerge early and compound over time - impacting design accuracy, construction efficiency, and ultimately rehabilitation outcomes. 
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial+Article+2+-+Construction+support+cycle+-+cut.png" alt="Info graphic showing From design to As-Constructed Evidence"/&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Planning and Design: Starting with the Right Data
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           A rehabilitation design cannot be developed without accurate, up-to-date survey data. Landform designs rely on a clear understanding of current site conditions, including the landform itself and the surrounding environment.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           If designs are developed from poor-quality or outdated data, errors can be introduced into final landform geometry and cut-to-fill balances. These issues often result in increased costs, rework, and challenges during construction.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Common challenges include:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Designs based on outdated or “tip-to” surfaces rather than current as-constructed conditions
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Erroneous or incomplete datasets
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Limited historic survey coverage
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Unaccounted material settlement in a landform over time
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Without accurate, up-to-date data, risks emerge early and compound across construction and long-term performance
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Establishing a strong survey data foundation at the outset is essential to developing practical and constructible rehabilitation designs.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial+Article+1+-+Design+surface+-+cut.png" alt="A geospatial design surface to develop a practical and constructible rehabilitation design."/&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Delivery: Enabling Efficient Construction
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           During the delivery phase, survey capability plays a critical role in ensuring works are carried out safely, efficiently, and within tolerance. Survey supports:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Field set-out for landform reshaping
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Marking of cut/toe lines and contour lines
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Pegging depths for rock armour and soil placement
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Setup and calibration of machine control systems
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           As landform designs become increasingly complex, the need for accurate survey control continues to grow. Proper setup and calibration of GPS-enabled plant is essential to achieving the design intent and maintaining productivity.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Delivery: Quality Assurance and Conformance
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Survey is central to quality control throughout the rehabilitation works program. At key hold points - and at completion - survey data provides the evidence required to demonstrate that:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Works have been constructed within agreed tolerances, or
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            The overall design intent has been achieved
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           This is critical for demonstrating compliance with closure commitments and ensuring outcomes are defensible to internal and external stakeholders.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial+Article+1+-+final+surface+-+cut.png" alt="Image of a final surface demonstrating compliance with closure commitments."/&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Monitoring: Understanding Long-Term Rehabilitation Performance
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Survey continues to provide value long after rehabilitation is complete. Modern monitoring techniques are increasingly survey-driven, including:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            ﻿
           &lt;/span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            LiDAR surveys, which enable detailed, landform-scale assessments of erosion and drainage performance
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Multispectral surveys, which provide insights into vegetation cover, health, density, and canopy structure
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           These methods allow for consistent, repeatable monitoring across entire landforms - not just sampled areas - supporting early identification of issues and informed decision-making over time.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial+Article+1+-+LiDAR+filtered+unfiltered+-+cut.png" alt="Filter and unfiltered LiDAR images from surveys, which enable detailed, landform-scale assessments of erosion and drainage performance"/&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Survey Equipment and Capability
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           At Mine Earth, our Geospatial team supports rehabilitation projects with modern survey technologies and experienced personnel.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our capability includes:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            ﻿
           &lt;/span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            GNSS survey systems
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Drone-based photogrammetry and LiDAR
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Multispectral data capture and analysis
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           These tools enable efficient, accurate data capture and support informed decision-making across the full project lifecycle.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;
           Closing Thoughts
          &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Survey is often viewed as a supporting discipline - but for mine rehabilitation, it is a critical contributor to efficient and successful outcomes.
            &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           By integrating high-quality survey data throughout design, delivery and monitoring, projects can:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Reduce risk
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Improve construction efficiency
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Strengthen quality assurance
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Demonstrate closure performance with confidence
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Next in the series, we look at how quality survey data supports landform rehabilitation during construction, helping turn rehabilitation design into reality.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="https://www.mineearth.com.au/landform-rehabilitation-how-quality-survey-data-turns-design-into-reality" target="_blank"&gt;
           Read Article 2 |
          &lt;/a&gt;&#xD;
    &lt;a href="https://www.mineearth.com.au/landform-rehabilitation-how-quality-survey-data-turns-design-into-reality" target="_blank"&gt;
           Landform rehabilitation: how quality survey data turns design into reality
          &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;
           Need support with rehabilitation survey and geospatial data?
          &lt;/strong&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Mine Earth provides practical geospatial solutions to support rehabilitation from planning and design through to construction, conformance and long-term monitoring.
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial-Article-2---Construction-support-cycle---cut-9419dac1-ed388135-9d445ede.png" length="1213092" type="image/png" />
      <pubDate>Thu, 05 Nov 2026 05:26:20 GMT</pubDate>
      <guid>https://www.mineearth.com.au/better-mine-rehabilitation-starts-with-better-survey-data</guid>
      <g-custom:tags type="string">Technical Articles</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial-Article-2---Construction-support-cycle--281-29-4c49ccb9.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/Geospatial-Article-2---Construction-support-cycle---cut-9419dac1-ed388135-9d445ede.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Career Opportunity - Senior Environmental Approval Specialist</title>
      <link>https://www.mineearth.com.au/career-senior-environmental-approval-specialist</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           About Us
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/strong&gt;&#xD;
    &lt;strong&gt;
           At Mine Earth, we’re a specialist mine closure consultancy passionate about sustainable outcomes. With offices in
          &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;
           Perth and Brisbane
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;
           , our team includes engineers, geologists, ecologists, and environmental scientists — united by a shared mission to restore post-mining landscapes and make a lasting difference. We’re growing and currently seeking a
          &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;
           Senior Environmental Approvals Specialist
          &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;
           to join our Perth-based team. If you’re ready to take on meaningful, diverse projects and work alongside industry-leading professionals, we’d love to hear from you.
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           What You’ll Be Doing
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Developing Mining Development and Closure Proposals (MDCP), Mine Closure Plans (MCP) and supporting approvals documentation for a range of commodities and project stages
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Supporting clients through the West Australian environmental approvals process, from planning, survey requirements, approvals, operations, and closure
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Providing technical guidance and reviews, including mentoring junior team members
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Coordinating technical studies and specialist consultants to support approvals and closure outcomes
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Managing project scopes, schedules, budgets, and client relationships
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Regulatory engagement to support approval applications and closure work
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Participating in client workshop sessions where required
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           What We’re Looking For
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Bachelor’s degree in environmental science, environmental management or planning- or similar
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            7+ years’ experience in mining approvals or mine closure, and strong understanding of WA approval pathways, including across EPBC Act, EP Act (Part IV and Part V), Mining Act requirements
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Excellent project management and stakeholder engagement skills
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Strong work ethic and collaborative approach to teamwork
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Desirable Skills
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            GIS and mapping skills
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Environmental planning
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Undertaking and facilitating risk assessment sessions
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Mining experience (either onsite or consulting)
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Why Join Us?
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Work on diverse mining projects across Australia and overseas
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Enjoy flexible working arrangements and a supportive team culture
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Be part of a multidisciplinary team that values collaboration and innovation
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Build your career with access to leadership opportunities and technical development
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Location
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;
           :
          &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
           Perth-based with occasional short-term site travel
          &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      &lt;br/&gt;
           Eligibility
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;
           :
          &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
           You must have a valid driver's license and the right to work in Australia
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Apply Now
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;
           To apply, please submit your resume along with responses to the three questions below (max 100 words per question) in place of a cover letter.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Questions:
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ol&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Describe a recent project where you have supported a mine through the environmental approvals process—what was the approvals pathway, and were there any roadblocks or issues.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            What do you believe are the key elements of effective regulator engagement, and how have you applied these?
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Approvals are often heavily schedule driven—can you tell us about how you manage shifting and/or conflicting priorities? How do you interface with the client when this happens?
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            What motivates you to work in the environmental approvals sector, and what type of team culture helps you to perform at your best?
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ol&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/51491156/dms3rep/multi/Career+opportunity+for+Environmental+specialist+Mine+Earth+WA+Oconnor.jpg" length="517642" type="image/jpeg" />
      <pubDate>Thu, 20 Aug 2026 05:31:20 GMT</pubDate>
      <guid>https://www.mineearth.com.au/career-senior-environmental-approval-specialist</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/Career+opportunity+for+Environmental+specialist+Mine+Earth+WA+Oconnor.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/Career+opportunity+for+Environmental+specialist+Mine+Earth+WA+Oconnor.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Career Opportunity - Environmental Scientist (QLD)</title>
      <link>https://www.mineearth.com.au/mine-earth-environmental-scientist-qld</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           About Us
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;
           At Mine Earth, we’re a specialist mine closure consultancy passionate about environmental outcomes. With offices in Perth and Brisbane, our team includes engineers, geologists, ecologists, and environmental scientists united by a shared mission to restore post-mining landscapes and make a lasting difference.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           We’re growing and currently seeking an Environmental Scientist to join our Brisbane-based team. If you’re ready to take on meaningful, diverse projects and work alongside industry-leading professionals, we’d love to hear from you.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           What You’ll Be Doing
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Analysing data and developing succinct and clear reports
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Producing maps and figures for reports
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Supporting the development of Mine Closure Plans (MCP) and Progressive Rehabilitation and Closure Plans (PRCPs) for a wide range of commodities
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           What We’re Looking For
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Bachelor’s degree in environmental science or similar
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            0 - 5 years’ experience in the environment field
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Strong work ethic and practical team player
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Experience in GIS and mapping skills
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Other Desirable Skills and Experience
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Project approvals
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Botanical or rehabilitation monitoring background
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Mine site experience
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Soil science
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Why Join Us?
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Work on diverse mining projects across Australia and overseas
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Enjoy flexible working arrangements and a supportive team culture
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Be part of a multidisciplinary team that values collaboration and innovation
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Build your career with access to leadership opportunities and technical development
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Location
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;
           :
          &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
           Brisbane-based with occasional short-term site travel
          &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      &lt;br/&gt;
           Eligibility
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;
           :
          &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
           You must have a valid drivers license and the right to work in Australia
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Apply Now
          &lt;/strong&gt;&#xD;
    &lt;strong&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;
           To apply, please submit your resume along with responses to the three questions below (max 100 words per question) in place of a cover letter.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
           Questions:
          &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ol&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Describe your experience in using a GIS platform or remote sensing. What are some of the components of this that you have enjoyed?
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Tell us about your experience in the environmental field?
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            What motivates you to work in mine closure and environmental rehabilitation?
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            What do you value most in a team?
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ol&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/51491156/dms3rep/multi/20210524_112431-68f26109.jpg" length="647377" type="image/jpeg" />
      <pubDate>Thu, 13 Aug 2026 09:50:07 GMT</pubDate>
      <guid>https://www.mineearth.com.au/mine-earth-environmental-scientist-qld</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/20210524_112431-68f26109.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/20210524_112431-68f26109.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Material Hydraulic Properties - A Critical Input for Landform Design</title>
      <link>https://www.mineearth.com.au/material-hydraulic-properties-a-critical-input-for-landform-design</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           &amp;#55357;&amp;#56589; &amp;#55349;&amp;#56800;&amp;#55349;&amp;#56796;&amp;#55349;&amp;#56801;&amp;#55349;&amp;#56792; &amp;#55349;&amp;#56790;&amp;#55349;&amp;#56799;&amp;#55349;&amp;#56802;&amp;#55349;&amp;#56806;&amp;#55349;&amp;#56808;&amp;#55349;&amp;#56805;&amp;#55349;&amp;#56792; &amp;#55349;&amp;#56793;&amp;#55349;&amp;#56802;&amp;#55349;&amp;#56790;&amp;#55349;&amp;#56808;&amp;#55349;&amp;#56806;
           &lt;br/&gt;
            &amp;#55357;&amp;#56487; &amp;#55349;&amp;#56800;&amp;#55349;&amp;#56788;&amp;#55349;&amp;#56807;&amp;#55349;&amp;#56792;&amp;#55349;&amp;#56805;&amp;#55349;&amp;#56796;&amp;#55349;&amp;#56788;&amp;#55349;&amp;#56799; &amp;#55349;&amp;#56795;&amp;#55349;&amp;#56812;&amp;#55349;&amp;#56791;&amp;#55349;&amp;#56805;&amp;#55349;&amp;#56788;&amp;#55349;&amp;#56808;&amp;#55349;&amp;#56799;&amp;#55349;&amp;#56796;&amp;#55349;&amp;#56790; &amp;#55349;&amp;#56803;&amp;#55349;&amp;#56805;&amp;#55349;&amp;#56802;&amp;#55349;&amp;#56803;&amp;#55349;&amp;#56792;&amp;#55349;&amp;#56805;&amp;#55349;&amp;#56807;&amp;#55349;&amp;#56796;&amp;#55349;&amp;#56792;&amp;#55349;&amp;#56806; – &amp;#55349;&amp;#56788; &amp;#55349;&amp;#56790;&amp;#55349;&amp;#56805;&amp;#55349;&amp;#56796;&amp;#55349;&amp;#56807;&amp;#55349;&amp;#56796;&amp;#55349;&amp;#56790;&amp;#55349;&amp;#56788;&amp;#55349;&amp;#56799; &amp;#55349;&amp;#56796;&amp;#55349;&amp;#56801;&amp;#55349;&amp;#56803;&amp;#55349;&amp;#56808;&amp;#55349;&amp;#56807; &amp;#55349;&amp;#56793;&amp;#55349;&amp;#56802;&amp;#55349;&amp;#56805; &amp;#55349;&amp;#56799;&amp;#55349;&amp;#56788;&amp;#55349;&amp;#56801;&amp;#55349;&amp;#56791;&amp;#55349;&amp;#56793;&amp;#55349;&amp;#56802;&amp;#55349;&amp;#56805;&amp;#55349;&amp;#56800; &amp;#55349;&amp;#56791;&amp;#55349;&amp;#56792;&amp;#55349;&amp;#56806;&amp;#55349;&amp;#56796;&amp;#55349;&amp;#56794;&amp;#55349;&amp;#56801;
           &lt;br/&gt;
            
           &lt;br/&gt;
            &amp;#55349;&amp;#56808;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56817;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56817;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56820; &amp;#55349;&amp;#56821;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56836; &amp;#55349;&amp;#56836;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56831; &amp;#55349;&amp;#56826;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56835;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832; &amp;#55349;&amp;#56833;&amp;#55349;&amp;#56821;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56820;&amp;#55349;&amp;#56821; &amp;#55349;&amp;#56835;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56832; &amp;#55349;&amp;#56826;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56825; &amp;#55349;&amp;#56833;&amp;#55349;&amp;#56838;&amp;#55349;&amp;#56829;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832; is fundamental to developing high-quality closure designs for mining landforms and for effectively managing long-term closure risks.   &amp;#55349;&amp;#56795;&amp;#55349;&amp;#56838;&amp;#55349;&amp;#56817;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56816; &amp;#55349;&amp;#56816;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56817;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56816;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56835;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56838; is a key parameter in understanding how different materials will perform within a cover system, assessing long-term erosion risks on landforms, and optimising on-landform drainage controls.
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
            
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            While &amp;#55349;&amp;#56825;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56815;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56838; &amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56820; remains an essential tool for characterising the hydraulic conductivity of materials, it has inherent limitations. Laboratory tests are often constrained by the particle sizes that can be accommodated, and the samples may not always accurately represent in-field conditions.
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
            
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            For instance, &amp;#55349;&amp;#56819;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56817; &amp;#55349;&amp;#56832;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56826;&amp;#55349;&amp;#56829;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56818; &amp;#55349;&amp;#56816;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56816;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56827; frequently requires the removal of coarse materials such as cobbles and boulders, which can significantly influence test results—particularly for materials with a low proportion of fines. Additionally, the relatively small size of field samples can make it challenging to capture the full variability of material types present across a landform.
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
            
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            &amp;#55349;&amp;#56796;&amp;#55349;&amp;#56827; &amp;#55349;&amp;#56832;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56834; &amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56820; &amp;#55349;&amp;#56826;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56821;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56817;&amp;#55349;&amp;#56832;, such as the use of a &amp;#55349;&amp;#56794;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56829;&amp;#55349;&amp;#56821; &amp;#55349;&amp;#56829;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56826;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56826;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56831;, can help address these limitations by directly measuring the hydraulic conductivity of the target material in the field. &amp;#55349;&amp;#56794;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56829;&amp;#55349;&amp;#56821; &amp;#55349;&amp;#56829;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56826;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56826;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56831; &amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56820; can be conducted rapidly across multiple locations, providing insights into material variability and the effects of different treatments (e.g. heavily compacted versus non-compacted areas).
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
            
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            By &amp;#55349;&amp;#56816;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56826;&amp;#55349;&amp;#56815;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56820; &amp;#55349;&amp;#56825;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56815;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56838; &amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56833; &amp;#55349;&amp;#56831;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56832; &amp;#55349;&amp;#56836;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56821; &amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827; &amp;#55349;&amp;#56832;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56834; &amp;#55349;&amp;#56819;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56817; &amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56835;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56820;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56832;, including Guelph permeameter measurements, practitioners can develop a more comprehensive understanding of material behavior. &amp;#55349;&amp;#56807;&amp;#55349;&amp;#56821;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56832; &amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56820;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56817; &amp;#55349;&amp;#56814;&amp;#55349;&amp;#56829;&amp;#55349;&amp;#56829;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56816;&amp;#55349;&amp;#56821; &amp;#55349;&amp;#56818;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56821;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56816;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832; &amp;#55349;&amp;#56816;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56819;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56817;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56816;&amp;#55349;&amp;#56818; &amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827; &amp;#55349;&amp;#56825;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56817;&amp;#55349;&amp;#56819;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56826; &amp;#55349;&amp;#56817;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56820;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56832; &amp;#55349;&amp;#56814;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56817; &amp;#55349;&amp;#56832;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56829;&amp;#55349;&amp;#56829;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56832; &amp;#55349;&amp;#56826;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56818; &amp;#55349;&amp;#56831;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56815;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56833; &amp;#55349;&amp;#56816;&amp;#55349;&amp;#56825;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56832;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56818; &amp;#55349;&amp;#56828;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56816;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56826;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56832;.
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;
            
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            &amp;#55357;&amp;#56568; The accompanying images illustrate the use of the Guelph permeameter in different material types, as well as Elis Smedley &amp;#55349;&amp;#56816;&amp;#55349;&amp;#56828;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56817;&amp;#55349;&amp;#56834;&amp;#55349;&amp;#56816;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56820; &amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56818;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56825; &amp;#55349;&amp;#56833;&amp;#55349;&amp;#56831;&amp;#55349;&amp;#56814;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56827;&amp;#55349;&amp;#56820; &amp;#55349;&amp;#56836;&amp;#55349;&amp;#56822;&amp;#55349;&amp;#56833;&amp;#55349;&amp;#56821; Nickolai Nazarov.
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
             To find out more, click on the
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://www.linkedin.com/feed/update/urn:li:activity:7333643242741153792" target="_blank"&gt;
           link
          &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/51491156/dms3rep/multi/Testing+Hydraulic+Conductivity+Field+Insights+for+Smarter+Landform+Design.png" alt=""/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/51491156/dms3rep/multi/rock.jpg" length="202235" type="image/jpeg" />
      <pubDate>Mon, 28 Jul 2025 13:58:00 GMT</pubDate>
      <guid>https://www.mineearth.com.au/material-hydraulic-properties-a-critical-input-for-landform-design</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/Testing+Hydraulic+Conductivity+Field+Insights+for+Smarter+Landform+Design.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/rock.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Mine Earth’s Dr. Véronique Lévy Co-Authors Paper at ICARD Canada Conference 2024</title>
      <link>https://www.mineearth.com.au/mine-earths-dr-veronique-levy-co-authors-paper-at-icard-canada-conference-2024</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Mine Earth is pleased to announce that Dr. Véronique Lévy, Senior Principal Geochemist, has co-authored a paper presented at the ICARD conference hosted by the Canadian Institute of Mining in Halifax this week.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The paper, titled "The Importance of Quality Control of Alkalinity Data during Pit Lake Modelling," emphasizes the critical role of alkalinity in acid neutralization and its influence on closure strategies. This research highlights Dr. Lévy's commitment to producing reliable water quality predictions essential for effective site closure.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Additionally, we would like to recognize Dr. Peter Scott, the principal author of the paper, who presented this important work at the conference. Congratulations to all three co-authors for their significant contribution!
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
            ﻿
           &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="https://irp.cdn-website.com/51491156/files/uploaded/The_Importance_of_Quality_Control_of_Alkalinity_Data_during_Pit_Lake_Modelling_Abstract.pdf" target="_blank"&gt;
           Abstract: The Importance of Quality Control of Alkalinity Data during Pit Lake Modelling.
          &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/51491156/dms3rep/multi/IMG_0197.jpg" length="298018" type="image/jpeg" />
      <pubDate>Thu, 19 Sep 2024 05:26:26 GMT</pubDate>
      <guid>https://www.mineearth.com.au/mine-earths-dr-veronique-levy-co-authors-paper-at-icard-canada-conference-2024</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/IMG_0197.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/51491156/dms3rep/multi/IMG_0197.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
